Two mining hubs in South of Peru

Soleil Metals operates two fully licensed and operational gold processing plants. The location of both units in close proximity to mining basins makes it the main partner of AGSM communities in southern Peru.

VICTORIA

Capacity of 100 tons per day within the province of Caraveli

Located in the mining province of Caravelí, within the Arequipa region, Victoria has a licensed and operational capacity of 100 tons per day. The facilities comprise a fully integrated gold processing plant, equipped with desorption and smelting systems.

The plant offers a complete range of services, including weighing, crushing, milling, and sampling, as well as tank leaching systems and tailings storage facilities. The site covers approximately 17 hectares, providing ample space for future plant expansion.

YACARI

Capacity of 350 tons per day within the Nazca-Ocona Gold Belt

Yacarí is a custom-built, fully operational gold ore processing facility featuring a tank leaching circuit for gold extraction, along with its own metallurgical and chemical laboratories.

Strategically located in the Arequipa region of Peru, the plant is fully equipped with modern infrastructure, situated just 10 minutes from the Pan-American Highway, within the Nazca–Ocoña Gold Belt in southern Peru.

Yacarí is located at sea level, approximately 47 kilometers from Victoria Plant, Soleil Metals’ other mineral processing facility.